[Product Description]
PVD 18k Real rose gold /Titanium color coating equipment
The equipment structure is rigorous and the gold target is expensive. In order to save real gold materials, we designed the machine with a special structure to make the equipment easy to use and save gold, thus achieving the desired effect.
In addition, this device is equipped with intermediate frequency technology.Is a device that works under a relatively high vacuum degree. It is mainly used to form a thin film on a substrate (the object to be coated). The working principle of this coating machine is mainly based on two technologies: evaporation and sputtering.Medium frequency magnetron sputtering technology is one of the more prominent technologies in medium-high temperature medium frequency vacuum coating machines. It uses magnetic field to control the movement of electrons in non-uniform electromagnetic field, so that the evaporated molecules of the film body are accelerated to bombard the target material under the action of electric field, sputtering a large number of target atoms, which are deposited on the substrate to form a thin film. This technology has the characteristics of high sputtering rate, low substrate temperature rise, good film-substrate bonding, and stable device performance.
Sputterable materials: ZrN, TiN, TiN, CrN, TiCN, TiAIN, TiAICN,TiAICrN etc.
Coating color: gold, champagne gold, gun black, dark black, rose gold, blue, green, etc.
Application fields: sanitary ware, clocks, lamps, hardware and other medium and high temperature alloy industries.
[PVD]
Physical Vapor Deposition: Vacuum deposition methods which can be used to deposit thin films and coatings.
[ARC ion coating]
The multi-arc ion plating machine uses arc discharge to evaporate the cathode material, and the evaporated material forms positive ions. Under the action of a strong electric field, electrons overflow into the vacuum in the form of field electron emission. The positive ions are attracted to the cathode surface to form a space charge layer, thereby enhancing the performance of the film layer.
[DC sputtering coating]
The principle of PVD gold plating is to form a metal film on the surface of the substrate by ion bombardment and metal ion deposition in a vacuum environment through physical vapor deposition (PVD) technology. The specific process is as follows:
1. Vacuum environment: Under vacuum conditions, the metal target (such as pure gold target) is placed in a vacuum chamber to prevent oxidation and other impurities.
2. Ion bombardment: By applying high voltage and magnetic field, ions are accelerated and hit the metal target in a vacuum environment. These ions will knock out atoms on the surface of the metal target to form metal ions.
3. Deposition: These metal ions are deposited on the surface of the substrate in a vacuum to form a uniform and dense metal film.
[Films classified with colors]:
Real gold an real rosegold coating
Imitation gold series: TiN, ZrN, TiN+Au, ZrN+Au
Rose Gold Series: TiCN, TiAlN, TiCN+Au--Cu, TiAlN+Au, Cu
Silver white series: CrN, CrSiN, Zr (micro N)
Grey series: Ti, stainless steel (S.S), (S.S) N
Coffee color series: TiCN, TiAlCN, ZrC
Blue series: TiO, CrO, TiALN
Black Series: TiC, TiC+iC, TiCN, TiAlN, TiAlCN, Ti (C, O) and DLC
Substrate Material: Glass, Metal (carbon steel, stainless steel, brass), Ceramics, Plastic, Jewelry.
Recommend Machine: Multi Arc Ion Coating Machine
Structure Type: Vertical structure, #304 Stainless Steel
A. Coating Film: Multi-functional metal film, composite film, transparent conductive film, reflectance-increasing film, electromagnetic shielding film, decorative film
B. Film Color: multi colors, gun black, titanium golden color, rose golden color, stainless steel color, purple color and other more colors
C. Film type: TiN, CrN, ZrN, TiCN, TiCrN, TiNC, TiALN and DLC
D. Consumables in production: Titanium, Chromium, Zirconium
[Equipment features]
Equipment features: The equipment has the advantages of quick pumping, strict control of process temperature, fast deposition, and good process repeatability.
It can be coat Titanium film,Titanium Nitride,and zirconium nitride, chromium nitride etc.Steel jewelry products are plated with real gold. Generally, titanium nitride is used as the base, and then a thin layer of coating is plated on the surface with a real gold target.
in a very short time to complete all the machining process, it is a highly efficient multi-functional coating equipment.
Comparison between ordinary TiN and real gold.Helped customers achieve the color of real gold without plating real gold.Can you tell the difference between real and fake colors?
Multi-arc + magnetron sputtering technology can perfectly achieve the various colors expected by customers.
what colors do you need,please don't hesitate tell me. We can not only provide equipment, but also teach you coating technology.
In vacuum coating, the arc is an important part of the equipment. Our company has advanced arc operation technology, which can effectively provide effective use space for arc targets.
Applied industry: Jewelry Vacuum Coating Machine can be used to coat metal film, titanium nitride, and zirconium nitride, chromium nitride and titanium, nickel, chromium, copper, and other compounds film, multi-layer, and it can be in a very short time to complete all the machining process, it is a highly efficient multi- functional coating equipment.
[Process]
[pump group]
[Shipping ]
Product Parameters
Technical data |
LYDC0506 |
LYDC1011 |
LYDC-1212 |
Dimension |
500*600mm |
1000*1100mm |
1200*1200mm |
(Pumping speed (no load clean) |
5.0x10-3<10min |
Ultimate vacuum (Pa) |
8.0x10-4 Pa |
water cooling temperature |
<25ºC |
Coating mode and main confirguration |
3 sets arc targets + two sets of plane DC sputtering targets |
6 sets arc targets + two sets of plane DC sputtering targets |
10 sets arc targets + two sets of plane DC sputtering targets |
Process gas control |
Quality flowmeter + electromagnetism ceramic valve |
vacuum system |
1.Molecular pump/diffusion pump+mechanical pump+maintenance pump
2.Well-known brand power supply
3.ARC |
remark |
We can customize the size of the machine according to customer requirements |
FAQ
1.Q:How long does the training take?
A:About 7-10 days.
2.Q:How long is the delivery period?
A: 60 working days.
3.Q:what's your afer-sales service?
A: We provide free installation and training services, as well as technical support.
4.Q:What payment methods do you accept?
A:we accept T/T,LC